Do you know the LEED for Neighborhood Development (ND) certification? It is an expansion of the growing demand for green homes and commercial buildings to the community at large. Get ready properly for the LEED AP ND exam using DumpsBase LEED AP ND dumps (V8.02). The professional team has collected 100 practice exam questions and answers, which are remarkably beneficial, allowing you to elevate your abilities effortlessly. By using the latest LEED AP ND dumps of DumpsBase, you can train successfully for the LEED AP ND exam questions and perform well. We supply numerous pieces of advice with LEED AP ND questions and answers for training and reaching the LEED AP Neighborhood Development (LEED AP ND) exam’s aims. By choosing the up-to-date LEED AP ND exam dumps, practice proficiently, achieve the aims thoroughly, and boost your career.

LEED for Neighborhood Development (ND) LEED AP ND Free Dumps

1. A non-Infill site has prime agricultural soils in areas of the site where construction is planned.

Which would contribute to meeting the Smart Location and Linkage Prerequisite. Agricultural Land Conservation?

2. What information is required to determine if a project quality for the Green Infrastructure and Buildings Credit. Wastewater Management?

3. A project calculates an overall annual heating and/or cooling consumption reduction using an energy efficiency model.

Which credit would this calculation aid in documenting?

4. A project builds a central plant that burns biomass products to provide space heating and hot water to the development.

Which of the following Green Infrastructure and Buildings credits could this help the project achieve?

5. Which of the following is a minimum program requirement of LEED® Neighborhood Development?

6. Which of the following would meet the requirements of an infill site?

7. To develop within a 100-year flood plain and still meet the requirements of Smart Location and Linkage Prerequisite. Floodplain Avoidance, the project team must comply with the National Flood Insurance Program (NFIP) and locate the project

8. What is the development footprint?

A)

B)

C)

D)

9. A standardized base map that should be used throughout the submission to illustrate relevant surrounding features for up to 1 mi. (1.6 km) around the project boundary is a

10. A square site with four equally sized neighboring parcels is being considered for a LEED for Neighborhood Development project. Consider the following: on the north side of the site is forest land; on the east side Is a church located on a parcel that is 100% developed: and on the south side is a school located on a parcel that is 50% developed.

Which one of the following uses on the west side would make this an infill site?

11. Which of the following innovation proposals is most likely to be successful to achieve Innovation, Option 1: Innovation?

12. To achieve Neighborhood Pattern and Design Credit. Community Outreach and involvement. Option 1: Community Outreach during Preliminary Design, the project team must advertise and host at least one community meeting.

Which of the following is an example of a community meeting that is applicable towards this credit?

13. Project plans call for 60 detached single-family homes. 120 attached three-story townhomes, and an apartment budding with 100 dwelling units in five stones.

Which choice below satisfies the requirements of Neighborhood Pattern and Development Credit Visitability and Universal Design?

14. Which location type would earn the maximum points under the Smart Location and Linkage Credit. Preferred Locations Option 1: Location Type?

15. A project includes previously developed lots within the LEED for Neighborhood Development boundary.

For the purpose of calculating previously developed site area, which lot size may be considered to be 100% previously developed?

16. To meet the requirement of Smart Location and Linkage Credit. Access to Quality Transit, on a 600-ace 1243 hectares) site with 3,500 dwelling units, what Is the minimum number of units that must be within 1/4 mi. (400 m) walk distance of an existing streetcar stop?

17. An undeveloped five acres (two hectare) site has a two-acre (0.8 hectare) area sloping al 50%.

To achieve Smart Location and Linkage Credit. Steep Slope Protection, what possible percentage of the site could be developed?

18. The baseline energy use for the Green Infrastructure and Buildings credit. Infrastructure Energy Efficiency is calculated by using

19. Winch of the following minor improvements within a required buffer zone may be undertaken to enhance appreciation for a wetland or body of water, provided such facilities are open to public access?

20. A LEED tot Neighborhood Development project team may need to contact or use reference materials from the U.S. Environmental Protection Agency of local equivalency outside the US. Regarding.

21. What can be omitted from the calculation verifying the percentage of reuse of buildings undergoing major renovation?

22. Which of the following will be achieved If the project site is an infill site?

23. A project team is planning to achieve the maximum points in the Regional Priority category. The LEED AP should

24. A LEEDV for Neighborhood Development registered project is planning on using air conditioning condensate tor flushing toilets in all new buildings.

What LEED Prerequisite or credit will this design help achieve?

25. For a 100% previously developed site, which of the following steps should the project team take during the Initial stages of planning to meet the requirements of Smart Location and Linkage Prerequisite. Imperiled Species and Ecological Communities Conservation?

26. A project site is located in a Federal Empowerment Zone What Is also needed to qualify the protect tor Smart Location and Linkage Credit. Preferred Locations Option 3: Designated High-Priority Locations?

27. The intent of Neighborhood Pattern and Design Credit. Community Outreach and Involvement is to

28. As defined by the Minimum Program Requirements, the LEED project boundary includes the

29. The LEED for Neighborhood Development project learn is tabulating the potential number of points.

What is the maximum number of points the team can earn through Regional Priority credits?

30. On a project with 10 residential units, which of the following would contribute to achieving Neighborhood Pattern and Design Credit. Neighborhood Schools?

31. The LEED for Neighborhood Development project team needs to prepare a flood map as an exhibit tor an upcoming zoning commissioning meeting.

Which of the following government agencies provides this data?

32. A LEED for Neighborhood Development project is going to temporarily reroute existing transit service outside the required distances as pan or the construction process. The protect team has secured an agreement with the transit agency to restore the rerouted service.

What is the maximum number of years the service can be rerouted in order to quality tor Smart Location and Linkage Credit. Access to Quality Transit?

33. What factor determines the percentage of undeveloped land that must remain undisturbed for Green Infrastructure and Buildings Credit. Minimized Site Disturbance?

34. A project team would like to attempt the credit Transit Facilities' and is working with the local transit agency to inventory the existing and proposed bus stops within the project boundary. Oi the five proposed bus stops, one stop will be in operation at the same time when the project completes, and two stops will be in operation in the second year alter the project's completion. The remaining two bus stops will be in operation m me third year after the project's completion.

How many proposed bus stops can the project team Include in the application form to attempt the credit?

35. Which strategy contributes to earning points for the Green Infrastructure and Buildings Credit, Indoor Water Use Reduction?

36. A brand new community is being constructed on a greenfield site. In order to reduce energy consumption, a district heating and cooling system will be built Which or the following may be excluded from the system to achieve Green Intra structure and Buildings Credit. District Heating and Cooling?

37. A project is pursuing Neighborhood Pattern and Design Credit. Local Food Production Restrictions in deeds or covenants, conditions, and restrictions (CC&Rs) may prohibit greenhouses in which location?

38. A project site Includes 3.500 ft. (1.067 m) of streets, excluding driveways and utility vaults.

How many street trees must be planted to meet the minimum requirements or Neighborhood Pattern and Design Credit. Tree-Lined and Shaded Streetscapes. Option 1: Tree-Lined Blocks?

39. A project team has arranged to use recycled infrastructure components. Thirty percent (30%) by mass of the new material infrastructure components contain post-consumer recycled content. Ten percent (10%) by mass of the infrastructure is on-site reuse materials.

What Is the minimum additional percentage of recycled content (by mass) that must come from pre-consumer materials?

40. For Neighborhood Pattern and Design Tree-Lined and Shaded Streetscapes Credit - Option 2 Shaded Sidewalks.

What size of newly planted trees can be considered in calculating the percentage or shaded sidewalks?


 

LEED AP Building Design + Construction (LEED AP BD+C) Certification Exam: Comprehensive LEED AP BD+C Dumps for Learning

Add a Comment

Your email address will not be published. Required fields are marked *