When decide to choose some HCNP-OTN Transmission H31-331-ENU Questions, you will want to try free questions to test the quality of your H31-331-ENU exam questions. H31-331-ENU Huawei Certified Network Professional-OTN Transmission is a very important exam for HCNP-Transmission certification. HCNP-Transmission certification validates the knowledge and skills required to construct and manage transport networks. If you are also searching for H31-331-ENU exam questions, here, we share free HCNP-OTN Transmission H31-331-ENU Questions for testing.

Share Free HCNP-OTN Transmission H31-331-ENU Questions For Testing

1. Which of the following loopback method is appropriate to be used for positioning the wavelength-division optical fiber lines and connectors?

2. The following APE features and dependency constraints, the correct is ( ). (Select 2 Answers)

3. In the following layer overhead bytes, which does not support BIP8 parity?

4. When WDM system is debugging, the main is to ensure that the receiving end's power flatness and SNR's flatness.

5. There are five trigger conditions for protection switching. According to the priority of the trigger condition, from high to low, which of the following is correct?

6. Which of the following statements is wrong about ROADM?

7. About the operation of deleting the path from the network management, the following statement wrong is ( ).

8. Monitoring channel bit rate is different, just a little effects on the test results of the optical monitoring index of veneer interface, and relatively OTU veneer, OSC spectrum index requirement is much higher.

9. EFI board ETH1, ETH2, ETH3 port are connected through the network cable and network management computer port, to realize the network management system manage OSN 8800 device.

10. Optix OSN 8800 T64 sub-rack ID achieved by DIP switches on the AUX veneer.

11. Use OSC monitoring, run HWECC protocol of NG WDM network, which of the following does not generally result in ECC communication interrupt?

12. Optical power is an important factor affecting the transmission distance of the system in the WDM system. Which of the following alarms can’t be caused when the optical power is abnormal?

13. The 1:N power backup function that SCC provide for the system is implemented by the batteries on the SCC veneer.

14. When the cable between the FIU and FIU break down, the downstream site will report the optical layer warning of ( ). (Multiple Choice)

15. Which of the following statement about the operation of plug veneer is correct? (Select 3 Answers)

16. The OptiX OSN 8800 T64 system is configured with four PIU boards, which are powered by 1 + 1 hot backup.

17. What are the reasons why the BTU board reports R_LOS alarms? (Multiple choice)

18. OMS overhead in what board to deal with, which of the following is correct?

19. Which of the following veneers will cause the existing network business interruption in the process of replacement?

20. The OptiX OSN 6800 subrack supports seven pairs of dual slots: IU1 and IU2, IU3 and IU4, IU5 and IU6, IU7 and IU8, IU11 and IU12, IU13 and IU14, IU15 and IU16. The electrical service that can be scheduled between dual slots is the GE/ Any/ ODU1 signal. You do not need to configure an XCS board when you use a dual slot to schedule a layer service.


 

 

Free HCNP-VC(Huawei Certified Network Professional - Video Conference) H11-861-ENU Questions
Free HCS-Field-WLAN H20-311-ENU Test Questions

Add a Comment

Your email address will not be published. Required fields are marked *