SAP S/4HANA Production Planning and Manufacturing C_TS422_2020 Dumps Questions

100% real C_TS422_2020 dumps questions from DumpsBase are great for SAP Certified Application Associate – SAP S/4HANA Production Planning and Manufacturing certification. Real SAP certification C_TS422_2020 exam dumps covering the fundamental and core knowledge required of the SAP S/4HANA Manufacturing consultant profile. With the new C_TS422_2020 dumps, you can be sure that passing C_TS422_2020 exam is an easy thing.

Check SAP Certification C_TS422_2020 Free Dumps

1. Where do you maintain the duration of a production operation?

2. You want to triggering-house production of a semi-finished mater al before a sales order for the corresponding finished good is received .

Which planning strategy supports the consumption of planned independent requirements for the semi-finished material?

3. In a production process, you need acertain amount of liquid as input material. The source tank is directly connected to the reactor .

How can you process consumption postings?

4. For a production version to be valid and consistent what requirements must be fulfilled?

Note: There are 3 correct answers to this question.

5. Which bill of material (BOM) categories can you define in SAP S/4HANA? Note: There are 2 correct answers to this question.

6. What does forecasting in the demand planning cycle include? Note: There are 3 correct answers to this question.

7. In your project,you have several materials that are planned by different people .

How can

you assign the planning responsibility?

8. What are the possible results of a production planning run in Advanced Planning (PP/OS)? Note: There are 3 correct answers to this question.

9. You want to reduce planning efforts for B/C materials .

Which planning procedure do you recommend?

10. How can SAP S/4HANA support a GMP compliant production process? Note: There are 3 correct answers to this question.

11. What are possible configuration steps when setting up the alert monitor in Advanced Planning? Note: There are 3 correct answers to this question.

12. Which of the following elements does MRP take into account during net requirement calculation? Note: There are 2 correct answers to this question.

13. In which data objects do you maintain the production line as the work center for repetitive manufacturing? Note: There are 2 correct answers to this question.

14. What is a work center hierarchy in SAP S/4HANA capacity planning?

15. Your project team decides to use a make-to-order planning strategy for a strategic material in discrete manufacturing .

What is the impact of this decision? Note: There are 3 correct answers to this question.

16. Which actions does the system perform by default when you save a confirmation for a finished product in repetitive manufacturing? Note: There are 3 correct answers to this question.

17. In your plant, MRP is activated .

Which options do you have to exclude a material from the MRP run? Note: There are 2 correct answers to this question.

18. Mode selection is one of the scheduling options available in Advanced Planning in SAP S/4HANA. When can you use mode selection?

19. Why would you use phantom assemblies? Note: There are 3 correct answers to this question.

20. Your quality department detects a deviation in a raw material batch. Unfortunately, this batch has already been used in production .

How can you identify all affected finished goods stocks?

21. Which materials have a negative quantity in a bill of materials or in a recipe? Note: There are 3 correct answers to this question.

22. You have maintained the parameters for simple discontinuation the material master of a component .

Which business process will be affected if the available stock is zero and the discontinuation date is in the past?

23. You want to set up a make-to-order planning scenario for a finished material. Some components from the bill of materials (BOM) should be procured per sales order, other components should be procured for various requirements. Fore casting is NOT possible .

Which settings do you make to achieve this?

24. Advanced Planning uses master data and transaction data from SAP S/4HANA In which data obje can you set the advanced planning flag? Note: There are 2 correct answers to this question.

25. You want to create a production order from a planned order .

What methods could you use?

Note: There are 2 correct answers to this question.

26. Duringproduction order creation, several valid production versions are found .

How does the system choose the product conversion?

27. What is the purpose of a reporting point confirmation in repetitive manufacturing? Note:

There are 2 correct answers to this question.

28. You want to schedule an operation finitely, without moving other operations .

Which scheduling strategy do you select?

29. When working with both cross-plant and plant-specific material statuses in the mater al master, which status has the highest priority?

30. In the Schedule Production app, which settings can you make in the planning strategy? Note: There are 3 correct answers to this question.


 

SAP Billing and Revenue Innovation Management C_BRIM_1909 Dumps Questions Released
SAP SuccessFactors People Analytics: Reporting 1H/2021 Exam C_THR92_2105 Dumps

Add a Comment

Your email address will not be published. Required fields are marked *