Pass Your SAP Certified Application Associate – Production Planning & Manufacturing with SAP ERP 6.0 EHP7 exam now. This certification verifies the knowledge in the area of Production for the consultant profile. We have released new SAP Certified Application Associate C_TSCM42_67 Dumps Questions online with the great exam questions and answers to ensure that you can pass SAP certification C_TSCM42_67 exam successfully.

Read SAP Certified Application Associate C_TSCM42_67 Free Dumps Online

1. You select the master data for production orders via production versions.

Which information is contained in a production version?

2. The master data for an in-house production process is to be set up in the SAP ECC system. To do this, you should create a suitable routing that plans for five operations in an initial sequence (10, 20, 30, 40, 50). There should be an option of relocating operations 30 and 40 to a second sequence on other work centers if there are capacity bottlenecks.

What sequence type would you use to create the second sequence in the system?

3. Which functions can be triggered before releasing a production order? (Choose three)

4. You use a planning time fence and fixing type 1. You receive a customer order with a material availability date within the planning time fence.

What do you have to consider in this scenario?

5. Where can you define the default storage location for the material component of a production order? (Choose three)

6. Which types of objects can be changed with Engineering Change Management (ECM)? (Choose three)

7. Which objects can affect the calculation of capacity requirements for an operation? (Choose three)

8. In your company planning strategies are used in the SAP-ECC demand management that are based on consumption.

Which of the following statements about consumption is true? (Choose two.)

9. When analyzing the SAP ECC order report for a planned order for a finished product, you discover that one of the assemblies will not be available in time for the scheduled final assembly because of automatic forward scheduling.

Which planning procedure do you use to create a feasible production plan from a requirements planning perspective?

10. What features related to process orders can be used to fulfill Good Manufacturing Practices (GMP) requirements? (Choose three)

11. What are the names of the objects for process integration of production orders? (Choose two)

12. You want to use the different options for planning in SAP ECC.

What is the correct sequence of the planning procedures?

13. What could be a consequence of confirming an operation?

14. Which data forms the basis for calculating the capacity requirement for an operation? (Choose three.)

15. Which activities lead to a reduction of the capacity requirements for an operation? (Choose three)

16. You want to enhance the system statuses of a production order with user statuses.

How do you do this?

17. In SAP ECC, you calculate the standard available capacity for a work center capacity using the following data:

- Start: 7:00:00 a.m.

- End: 3:00:00 p.m.

- Break duration: 1 hour

- Rate of utilization: 80%

- Overload: 110%

- Number of individual capacities: 1

How large is the standard available capacity?

18. When testing requirements planning in plant 1000, you receive the error message displayed below. Large numbers of materials are already available in plant 1000. As a first step in solving the problem, you activate requirements planning in the Customizing for plant 1000.

What further tasks do you perform before you can use requirements planning in plant 1000 in SAP ECC?

19. A material was planned in the context of SAP ECC material requirements planning. The MRP controller subsequently processed the material by manually converting a specific planned order into a production order. The MRP controller now accesses the current stock/requirements list and the MRP list for this material and compares these two lists.

What do you have to consider for the two lists at this stage? (Choose two)

20. You want to plan a finished material using material requirements planning in an SAP ECC system. The resulting planned orders should be scheduled using basic date scheduling (not lead-time scheduling).

Which of the following properties for the resulting dependent requirements applies?

21. In which of the following objects can you activate back flushing for production orders? (Choose three)

22. Which function is supported by production orders?

23. Which options can you offer someone who uses the SAP ECC system for production orders and requires support for material supply in production? (Choose three.)

24. Which of the following scheduling types can only be used in capacity planning?

25. Which of the following features are offered by MRP areas in SAP ECC? (Choose two)

26. You want to produce a finished product only when it is requested by a customer order in make-to-order production. However, all assemblies need to be procured beforehand.

How can you fulfill these requirements in SAP ECC? (Choose two)

27. Which of the following situations occur when a production order is set to Technically Complete (TECO)? (Choose three.)

28. Which of the following elements do you have to prepare for costing of a production order to function without errors? (Choose three.)

29. What are the consequences of setting a production order to Technically Complete (TECO)? (Choose three)

30. The company you advise wants to carry out the material availability check automatically in the production order at various points in time.

Which of the following options would you recommend? (Choose two.)

31. What are characteristics of repetitive manufacturing? (Choose three)

32. Where can you define the valid receivers for production order costs?

33. Determination of the procurement type

34. Which of the following master data can be used with process orders? (Choose three)

35. In which master data object do you set the standard values for an operation?


 

SAP Commerce Cloud 1905 Developer P_C4HCD_1905 Dumps Questions
SAP Certified Application Associate C_S4FTR_1809 Real Dumps

Add a Comment

Your email address will not be published. Required fields are marked *