Reliable HPE0-S59 Exam Dumps – Best Way To Prepare For HPE0-S59 Exam In A Short Time

If you are so busy and have limited time to prepare for the HPE0-S59 HPE Compute Solutions certification exam, you will be recommended to choose the HPE0-S59 exam dumps as the learning materials. DumpsBase HPE0-S59 exam dumps are reliable with the correct dumps questions and answers, which could be great for the preparation. Just start learning all the HPE0-S59 exam dumps questions and memorize them well.

Check HPE Compute Solutions HPE0-S59 Free Exam Dumps First

1. Your customer plans to add four HPE Synergy frames to an existing management ring Ail installed frames are equipped with two 2-port FLM modules, while new frames will be equipped with 4-port FLM modules.

Which statement about mixing different FLM modules is true?

2. Your customer has the following HPE Synergy setup

- 3 HPE Synergy 12000 Frames

- 4 HPE Virtual Connect SE 100 Gb F32 Modules

- 2 HPE Synergy 50 GO Interconnect Link Modules

- 36 HPE Synergy 480 Gen10 Plus compute modules

- 2 HPE Composer 2 modules

Which statement about this setup is true?

3. Which statement about manual orchestration during the firmware update is true?

4. Your customer added a new Ethernet network in HPE Oneview mat is used to manage their HPE Synergy platform.

When the customer tries to connect one of the compute nodes to this network through the server profile, this network is not available.

What must be done to fix this issue?

5. Refer to the exhibit.

Which statement about this logical interconnect group is true?

6. Which compute node parameters are captured within server hardware type?

7. Which statement about login redistribution is true?

8. An administrator tries to open iLO interlace from HPE OneView Instead of being automatically logged in a login prompt displays

Where should you start the troubleshooting process?

9. Which statement about HPE Apollo 2000 Gen10 Plus platform is true?

10. You need to configure a RoCE network to enable lossless networking for HPE J2000 Flash Enclosure support Which interconnects are required to support this connection? (Select two.)

11. DRAG DROP

You need to setup HPE Synergy frames after hardware components are discovered within HPE OneView.

Put the steps to achieve this goal into the coned order in the answer area on the right.

12. A logical interconnect group can span on multiple HPE Synergy frames for which interconnect type?

13. Your customer wants to add dedicated Fibre Channel connectivity to the HPE Synergy frame running HPE Synergy 480 Gen10 compute modules, each with one CPU socket populated Currently they use two 12 Gb SAS switches and two HPE Virtual Connect SE 100Gb F32 Modules for HPE Synergy installed in third fabric.

What must be done to enable dedicated FC connectivity for this HPE Synergy frame?

14. Which statement about the HPE D3940 storage module is true?

15. Which statement about HPE Superdome Flex 280 is true?

16. Which tool can be used to evaluate me health of an HPE Oneview appliance before proceeding with an appliance updated.

17. Your customer plans to deploy HPE Superdome Flex and configure two nPars, each based on two chassis Which components must be included in the proposal to meet the customer’s needs?

18. DRAG DROP

Match HPE SimpliVity team with the definition.

19. You modified a logical interconnect group mat is used to configure logical interconnects in five different logical enclosures.

What will be the impact of that change?

20. HOTSPOT

Click the drop-down menu that will allow you to define the location of the master modules within the logical interconnect group.


 

Top HP5-C10D Dumps - Good Learning Materials For Selling HP Print Security 2020 delta Exam
Helpful HP2-I44 Dumps Updated For Passing Selling HP Workstations 2022 Exam Successfully

Add a Comment

Your email address will not be published. Required fields are marked *