Pega PCDC Version 8 Certification PEGAPCDC80V1_2019 Dumps

PEGAPCDC80V1_2019 Pega Certified Decisioning Consultant (PCDC) 80V1 2019 is a new subject of Pegasystems exam. Most 7.4 exams will be retired soon, you should take Version 8 to complete your Pega certifications:

  • The CUIS 7.1 certification was retired on February 28, 2019. All earned CUIS certifications remain valid.
  • The LSA Readiness 7.4 (PEGACLSA74V1-R) exam will be retired on October 31, 2019.
  • The Pega Architecture 7.4 (PEGACLSA74V1-A) exam will be retired on November 30, 2019.
  • The following 7.4 exams will be retired on December 31, 2019: CPBA 7.4, CSA 7.4, CSSA 7.4, CPMC 7.4, and CPDC 7.4. You must register and sit for the 7.4 exams by the retirement date. No retakes will be allowed after this date.

When preparing for PEGAPCDC80V1_2019 exam, come to get the most valid Pega PCDC Version 8 Certification PEGAPCDC80V1_2019 Dumps as the preparation materials.

Check PEGAPCDC80V1_2019 Free Dumps Questions First

1. U+ Bank offers two credit cards to its customers: the Cold Card and the Silver Card. The bank wants the annual fee property of the credit cards to be dynamic based on the customer lifetime value property. That is, customers with customer lifetime value greater than 65 receive a discount of 20% on the annual fee.

As a Strategy Designer, how do you implement this requirement in the decision strategy?

 
 
 
 

2. U+ Bank offers two credit cards to its customers: the Cold Card and the Silver Card. The bank wants the annual fee property of the credit cards to be dynamic based on the customer lifetime value property. That is, customers with customer lifetime value greater than 65 receive a discount of 20% on the annual fee.

As a Strategy Designer, which component do you use to implement this requirement?

 
 
 
 

3. Selection components provide the ability to ________________.

 
 
 
 

4. After launching a new product, the delta mode in Visual Business Director could show _______.

 
 
 
 

5. MyCo, an electronics company, wants to recommend television brands to their customers based on incoming emails.

As a Strategy Designer working for MyCo, you create the following Next-Best-Action strategy:

If the Email reason is Inquire LG, what does the Results of the strategy contain?

 
 
 
 

6. MyCo, an electronics company, wants to recommend television brands to their customers based on incoming emails. As a Strategy Designer working for MyCo, you create the following Next-Best-Action strategy:

If the Email reason is Inquire Philips, what does the Results of the strategy contain?

 
 
 
 

7. One of the purposes of the Interaction History decision component is to ___________.

 
 
 
 

8. When a customer is offered a proposition he has already accepted, this is because____________.

 
 
 
 

9. In a decision strategy, to remove propositions based on the current month, you use a _________.

 
 
 
 

10. What does a solid arrow from a “Set Property” component to a “Filter” component mean?

 
 
 
 

11. In a decision strategy, in order to select the proposition with the highest propensity, you use a _______________.

 
 
 
 

12. To run a delta report in the Visual Business Director, a minimum of two___________ are required.

 
 
 
 

13. U+ Bank uses a Next-Best-Action decision strategy to automatically approve credit card limit changes requested by customers. A scorecard model determines the customer credit score.

The automatic approval of credit card limits are processed based on the following criteria set by the bank:

The bank wants to change the threshold value for the USD 2000 credit limit from “<175” to “<200”.

As a Strategy Designer, how do you implement this change?

 
 
 
 

14. To calculate the average margin of four Propositions, you must use _____________.

 
 
 
 

15. U+ bank wants to offer a Gold Credit Card to its customers who have an annual income of more than USD 150000.

As a Strategy Designer, how do you implement this requirement in the decision strategy?

 
 
 
 

16. In a strategy, how can you check if a customer rejected a proposition?

 
 
 
 

17. The Prioritize component sorts offers in _______________.

 
 
 
 

18. In a strategy, the propositions are imported using a(n) _____________.

 
 
 
 

19. What is the name of the property that is automatically recomputed for each decision component?

 
 
 
 

20. DRAG DROP

You are a Strategy Designer on a Next-Best-Action project and are responsible for designing and implementing decision strategies.

Select each component on the left and drag it to the correct requirement on the right.

21. Arbitration components provide the ability to _______________.

 
 
 
 

22. To access a property from an unconnected component, you use the ____________.

 
 
 
 

23. U+ Bank a Next-Best-Action decision strategy to determine the credit rating of its customers. A scorecard model determines the customer credit score.

The business requirement is to determine the credit card rating based on the following table:

As a Strategy Designer, how do you implement the business requirement?

 
 
 
 

24. To use Product Holdings information in your strategy, which of the following components do you use?

 
 
 
 

Pega Certified Pega Marketing Consultant (CPMC) PEGACPMC74V1 Dumps
Certified System Architect (CSA) Version 7.4 PEGACSA74V1 Dumps

Add a Comment

Your email address will not be published. Required fields are marked *