Newest HCNP-DCF-BFDO H12-425-ENU exam questions are available

Take your HCNP-DCF-BFDO H12-425-ENU certification exam after you make some good practice exam questions to test online well. Study H12-425-ENU exam points as the following:

Huawei data center facility
Huawei power distribution system
Huawei data center cooling system
Huawei data center monitoring system
Other data center facility system

Master HCNP-DCF-BFDO H12-425-ENU exam points well and do some real exam questions test online. Why not start to test?

1. Which of the following is supported by the AI/DI port on the access control actuator?

2. When the ECC800 detects that the connection signal to the device is interrupted, a communication interruption alarm is generated. What are the possible reasons? (Multiple choice)

3. During the use of the battery pack, the appearance is normal, but there is no current during charging, and the voltage drop is zero at the moment of discharge, and it cannot be discharged. What could be happened in the following?

4. When the UPS2000-G shuts down the stand-alone system, which one of the following needs to be operated?

5. In the water side natural cooling scheme, cooling water can be directly supplied from the cooling tower to the air conditioner to complete the cooling.

6. Can a sunroof actuator drive up to several sunroof electromagnetic locks at the same time?

7. Which of the following is the correct procedure for powering up the UPS5000?

8. The FusionModule1000B series solution can meet the Tier4 power supply requirements when using the 2N power supply and distribution system.

9. When the integrated UPS is wired, if the input phase sequence is wrong, the machine will not work.

10. When installing the UPS5000-E, there should be a certain distance between the back and the top to ensure ventilation and heat dissipation.

11. When installing the UPS battery, the installation tool does not need to be insulated because the load is not charged.

12. Which is not a routine maintenance item of the ECC800 power module?

13. What is the terminal voltage of the battery in the open state?

14. The cabinet collector cannot be used for environmental data collection of IT cabinets.

15. Which humidifier is used by the NetCol 8000-A?

16. Which of the following options is a natural cooling system?

17. You can view the camera's name, code, IP address, model, status, and more in NetEco's Video menu.

18. Which of the following supports the UPS5000-E-400K-FM input line voltage? (Multiple choice)

19. In the installation scenario where the indoor unit is higher than the outdoor unit, the oil trap must be set.

20. The UPS2000-G-(6-20kVA) did not report a fault but the load was cut off due to a poor connection of the output cable.


 

Free Test H20-651-ENU HCS-Field-Server Exam Questions Online
Free to test H12-421 HCNP-DCF-BFDO certification exam questions

Add a Comment

Your email address will not be published. Required fields are marked *