Do you know the HCSA-Sales-Data Center Facility V2.0 certification exam? You can get details from our article, “Huawei H19-105_V2.0 Exam Dumps – Your Online Resources for Passing HCSA-Sales-Data Center Facility V2.0 Exam”. You will know what is the Huawei H19-105_V2.0 exam and also know the most updated dumps from DumpsBase for learning. New Huawei H19-105_V2.0-ENU dumps (V8.02) contain 540 practice exam questions and answers, which are all in English version. You can practice these Q&As in a PDF format that is available for download right after the payment. Discover the transformative power of PDF format, revolutionizing how you prepare for the HCSA-Sales-Data Center Facility V2.0 H19-105_V2.0-ENU exam. You can download the pdf file on your PC, laptop, Mac, tablet, and smartphone which means you can prepare anytime anywhere for your Huawei H19-105_V2.0-ENU exam. Also, we have free software for you designed to simulate actual exam mode. With both the PDF and software, you can practice the latest H19-105_V2.0-ENU exam questions to prepare for the HCSA-Sales-Data Center Facility V2.0 exam.

Experienced the H19-105_V2.0-ENU dumps (V8.02) by reading the free dumps below:

1. UPS5000 -A 30~120kVA can support wall installation.

2. UPS2000-G monitors the entire parallel system with one card. The parallel system only needs one communication option card to monitor the entire parallel system.

3. FusionModule1000A V2R3 version uses Huawei UPS5000E as IT load power supply

4. Fire extinguishing measures that can be adopted in Class A computer rooms include ()

5. The water inlet slope of the fan coil condensate tray should be no less than?

6. FusionModule2000 integrated UPS has two models: 50K/125K.

7. UPS2000-G adopts high power density design, 6k/10k is only 2U high, 15K/20K is only 3U high, reducing installation space.

8. The UPS5000-E power module adopts a fan fault-tolerant design. When two of the fans fail, how much load can the power module still carry?

9. What is the total IT load power of the FusionModule1000A V2R3 version 40-foot IT solution?

10. The EC fan brand used in the NetCol5000-A025H half-cabinet row-level variable-frequency air-cooled precision air-conditioning indoor unit is Xerox Bai.

11. Three-proof paint coating can significantly reduce the failure rate of UPS in harsh environments such as salt spray, dust, high temperature and humidity, ensuring its service life in harsh environments.

12. FusionModule1000A V2R3 version 40-foot CT solution can install 8 CT cabinets

13. Which of the following models can be equipped with an external large-capacity battery charger for fast recharging?

14. The basic principles of refrigeration for air-cooled and water-cooled air conditioners are the same

15. The fans of NetCol5000-C030H row-level chilled water precision air conditioners can be maintained online, and a separate power-off switch can be provided for each fan to avoid safety hazards caused by direct live maintenance.

16. UPS5000-E (50kVA power module) has a single cabinet capacity of 300kVA and can support 8 racks in parallel.

17. In FusionModule2000, when the columns occupy the closed channel space in the column-surrounding scene, how should the skylight be adapted?

18. The capacity management module of the NetEco management system can manage the resource capacity information in the computer room.

Which of the following capacity factors falls within the management scope of NetEco?

19. Which of the typical configurations of FusionModule800 are optional?

20. The NetEco management system can provide a temperature cloud map function to monitor the temperature distribution in the computer room and quickly identify hot spots in the computer room.

21. The backup time of UPS system is generally within 30 minutes, so it is more reasonable to use constant current method to calculate battery capacity.

22. Configure a modular redundant UPS system. As long as the number of modules meets the basic requirements, there is no need to consider the distribution of UPS modules on different racks.

23. The air conditioning water system includes the cooling water system, the chilled water system and the condensing water system.

24. Huawei precision air conditioners have RS485 communication interfaces for remote inspection and parameter setting of the system: Modbus open protocol is provided to access the computer room environment monitoring system to reduce service costs.

25. In UPS5000-A system, which of the following battery configuration is unreasonable?

26. FusionModule1000A V2R3 version IT solution comes standard with cabinet spring damping device

27. The power module efficiency of UPS5000-E (25-75kVA) is 96%.

28. Is the channel type of the typical configuration of FusionModule800 cold channel or hot channel?

29. FusionModule2000 requires a minimum equipment room height of 2.6 meters.

30. The PDU8000 precision power distribution cabinet uses a 7-inch liquid color touch screen, which can graphically display the power distribution cabinet system diagram and the status of each switch.

31. The FusionModule2000 sensor uses PoE ring network power supply to improve the reliability of control system signal transmission and can be used to control standards.

32. PDU8000 precision power distribution cabinet protection level ().

33. FusionModule500 & FusionModule800 can be equipped with emergency fans

34. Channel delivery authorization of B2 means that all CSPs at or above the certification level can deliver.

35. FusionModule1000A V2R3 version customized spraying can meet UL120min fire resistance requirements

36. The NetEco management system can provide a power distribution topology map function, which can realize full-link monitoring of power distribution from the introduction of AC power to the R PDU terminal.

37. What kind of inlet and outlet wiring methods can the FusionModule2000 integrated power distribution cabinet implement?

38. The power supply modes of FusionModule800 and FusionModule500 are 380/400/415/3Ph/50Hz and 220/230/240/1Ph/50Hz respectively.

39. The battery type supported by UPS2000-G is ().

40. The NetEco management system adopts a large-capacity design architecture, which can support the access of massive devices and the access of up to () 10,000 measurement points using a single X86 server. At the same time, the system operates smoothly and the CPU utilization rate is no higher than ()

41. Fusion800 has the function of automatic start-up when receiving a call for civil air conditioner

42. FusionModule1000A V2R3 version can be customized with bulletproof shell

43. When a third-party system needs to integrate NetEco or Huawei equipment, Huawei needs to provide northbound interfaces and protocols. The third-party system manufacturer needs to evaluate the access workload and do development and commissioning.

44. UPS2000-G-(6K-20K) has the strongest lightning protection design in the industry, with lightning protection level (), surge protection level (), which can avoid 90% failure caused by lightning strikes and reliably protect the AC input port of the back-end equipment.

45. The NetEco management system supports reporting alarm information to third-party management systems through the SNMP interface.

46. UPS5000-E has the function of adjustable battery number, which avoids the replacement of the entire battery group due to a single battery failure and solves the problem of difficult maintenance of traditional UPS batteries. How many adjustable batteries does UPS5000-E (50kVA module) support?

47. The operating temperature range of FusionModule800 is -20~45 degrees, and the operating temperature range of FusionModule500 is 0~45 degrees

48. The total current of the battery pack is 1000A, and 3 sets of batteries are configured. The most economical configuration of the cable from the main switch box to the branch switch box is: ()

49. The UPS5000-E battery adopts a neutral-line-free design, which makes it easy to reuse the old battery when replacing the tower unit.

50. The NetEco management system can automatically calculate the electricity expenses of the computer room based on the tiered electricity price strategy.


 

Huawei H19-301_V3.0 Dumps (V9.02) - Boost Your HCSA-Presales-IP Network V3.0 Exam Preparation with Premium Exam Questions and Answers

Add a Comment

Your email address will not be published. Required fields are marked *