LEED AP O+M Exam Dumps (V8.02) – The Latest Study Materials to Help You Complete the LEED AP Operations + Maintenance (LEED AP O+M) Exam

The LEED AP with specialty is the advanced credential of LEED to demonstrate expertise in green building and a specific LEED rating system. You must first earn the LEED Green Associate credential before pursuing this certification. It contains 5 exams below:

If you are preparing for your LEED AP O+M, come to DumpsBase and choose the LEED AP O+M exam dumps (V8.02) as the latest study materials. The USGBC LEED AP O+M exam dumps offer a comprehensive solution for candidates seeking to master the exam content. These materials are expertly curated by industry professionals to ensure alignment with the latest exam objectives. Access DumpsBase’s LEED AP O+M exam dumps (V8.02) and take the first step toward your professional advancement.

Check the USGBC LEED AP O+M free dumps below to verify the quality:

1. An ASHRAE Level 1 walkthrough analysis contributes to what prerequisite or credit?

2. Under Indoor Environmental Quality Credit, Interior Lighting, outlet powered task lighting contributes towards compliance for what category of building space?

3. What credit rewards customers who change their normal consumption patterns in response to the varying price of energy over time?

4. Cooling tower blowdown is necessary because

5. For projects not eligible for the ENERGY STAR® rating, the project team could demonstrate compliance with Energy and Atmosphere Prerequisite, Minimum Energy Efficiency Performance by

6. What is the allowed maximum tenant space exclusion for Energy and Atmosphere Prerequisite, Minimum Energy Performance?

7. The measures called out on the following site plan may contribute to the achievement of which LEED credits? (Click on Exhibit)

Exhibit

8. Buildings account for what percentage of total energy use?

9. A project owner has hired a Commissioning Authority (CxA) to develop a Commissioning (Cx) Plan which will be submitted in the LEED application to document Energy and Atmosphere Credit, Existing Building Commissioning - Analysis, Option 1. Existing Building Commissioning.

At a minimum, what should be included in the Cx Plan?

10. According to Indoor Environmental Quality Credit, Daylight and Quality Views, what is the view factor in the diagram below?

11. What percentage of individual occupant spaces must have individual lighting controls in projects

seeking Option 1.

Lighting Control in Indoor Environmental Quality Credit, Interior Lighting?

12. The LEED AP is searching the Addenda Database for LEED Interpretations that pertain to Sustainable Sites Credit, Light Pollution Reduction.

Which interpretations must be used when attempting this credit?

13. When tracking waste data during the performance period for Materials and Resources Credit, Solid Waste Management - Ongoing, which strategy may be used to document total and diverted waste?

14. Which of the following is the most appropriate use of untreated stormwater?

15. An equipment upgrade requires an initial investment of $1,500.00 USD with a total annual savings of $500.00 and a 33% rate of return.

What is the Simple Payback Period for this improvement?

16. A 1,500 ft2 (139 m2) mobile home is built in the downtown area of a major city. 90% of the project's gross floor will be completed by the time of occupancy. LEED certification is being sought.

Which rating system would be the most appropriate one to use?

17. Key functional and operational parameters such as occupied hours of a building, use by space type, required temperature settings, and lighting levels, are specified in the

18. The maximum number of points in the Innovation Category that can be achieved by exemplary performance is

19. Which product recycling requirement applies specifically to LEED AP® Operations and Maintenance Schools and Hospitality?

20. What is the percentage range of total municipal waste that commercial and institutional buildings

typically account for?

21. The project team is attempting to achieve Option 1. Lighting Controls in Indoor Environmental Quality Credit, Interior Lighting.

Which of the following is required documentation?

22. A project is ineligible for an ENERGY STAR® Rating and will document Energy and Atmosphere Prerequisite, Minimum Energy Performance by benchmarking against historical data.

If the performance period calendar year is 2022, which of the following is an acceptable historical baseline?

23. In following the Sheet Metal and Air Conditioning National Contractors Association (SMACNA) Indoor Air Quality (IAQ) Guidelines for Occupied Buildings under Construction, what is the Minimum Efficiency Reporting Value (MERV)

as determined by ASHRAE 52.2-2007 required for renovation activities?

24. The project team of an existing urban site has 4% total vegetated area and desires to increase the percentage to equal or be greater than 5%.

Which strategy can the team implement to achieve this goal?

25. Which of the following topics is unnecessary in order to comply with the Sustainable Sites Credit, Site Improvement Plan?

26. What is the intent of Indoor Environmental Quality Credit, Daylight and Quality Views?

27. Which of the following strategies is allowed under Energy and Atmosphere Credit, Renewable Energy and Carbon Offsets, and will help a project achieve Energy and Atmosphere Credit, Optimize Energy Performance?

28. What requirement must be met when creating a demand response program that satisfies Energy and Atmosphere Credit, Demand Response?

29. When developing a transportation survey, a LEED AP must make certain that the survey instrument collects information

30. When sampling a population in a multi-tenant building, how can the transportation surveys be distributed to meet Location and Transportation Credit, Alternative Transportation, Option 1. Transportation Survey?

31. An office building has an average annual occupancy of 75% and 30,000 ft2 (2 787 m2) of completely vacant space.

How many occupants should be entered into Portfolio Manager for the vacant office space?

32. Which of the following is an environmentally friendly technology for controlling erosion?

33. How long should a commercial kitchen prep sink be metered to establish a baseline when pursuing the Water Efficiency Prerequisite, Indoor Water Use Reduction, Option 2?

34. To determine possible credit compliance for Energy and Atmosphere Credit, Advanced Energy Metering, what information needs to be verified?

35. One tenant occupying 50% of a commercial office building pursuing LEED® O+M certification has provided purchasing data. The other tenants in the building occupying the remaining 50% have chosen not to provide purchasing data.

For credits related to purchasing, the LEED applicant must

36. A property manager is evaluating various bids from pest management services.

Which of the following service certifications would assist the existing building in achieving Indoor Environmental Quality Credit, Integrated Pest Management?

37. Presuming all water fixtures meet the LEED Operations and Maintenance Rating System requirements, which of the following statements is correct when considering baseline water usage in relation to water use?

38. Which of the following is a low impact development (LID) technique for rainwater management?

39. In order for a project team to meet the requirements of Indoor Environmental Quality Credit, Integrated Pest Management, how much advanced notice to building occupants is needed after the emergency application of a pesticide other than the least toxic pesticide?

40. In densely populated rooms, CO2 monitors must be located a minimum of how many feet (meters) above the floor?

41. What is the maximum number of points a project could achieve using innovation credits for the Innovation Credit, Innovation?

42. A project is pursuing Materials and Resources Credit, Solid Waste Management - Facility Maintenance and Renovation. The project has generated the following waste as part of their Facility Maintenance and Renovation activities: 2,000 lbs. (907.2 kg) of steel, 900 lbs. (408.2 kg) of carpet, 1,100 lbs. (498.9 kg) of wood, and 1,500 lbs. (680.4 kg) of wallboard.

If the project has diverted 1,800 lbs. (816.4 kg) of steel, 900 lbs. (408.2 kg) of carpet, 1,000 lbs. (453.6 kg) of wood, and 250 lbs. (113.3 kg) of wallboard, what is the actual diversion rate achieved?

43. A manufacturing plant is increasing units produced and the number of employees annually. The building is documenting compliance with Energy and Atmosphere Prerequisite, Minimum Energy Performance, Case 2, Option 1. Path 2 Benchmark Against Typical Buildings Using Comparables.

Which of the following should be used to normalize the building's energy use?

44. Which of the following is considered an ongoing purchase for the purpose of calculating Materials and Resources Credit, Solid Waste Management - Ongoing?

45. Which of the following strategies reduces the impact of materials used in building operation and maintenance on indoor air quality?

46. Landscape irrigation practices consume large quantities of potable water. By evaluating the project's outdoor water budget and irrigation water demand early in the Establishment Period in Water Efficiency Credit, Outdoor Water Use Reduction project teams will be able to

47. The project team has been directed by the building owner to only pursue practices that directly improve the actual building performance.

Which of the following would be the lowest cost option?

48. A district energy system provides chilled and hot water to a building on a campus.

What equipment must be commissioned to meet the requirements of Energy and Atmosphere Credit, Existing Building Commissioning - Analysis, Option 1. Existing Building Commissioning?

49. Which of the following products qualifies under Materials and Resources Credit, Purchasing - Ongoing?

50. What type of Credential does the principal participant of a project need to earn in order to achieve one point in the innovation credit?

51. An essential goal of retro commissioning, re-commissioning, or on-going commissioning for a building's energy using systems is to

52. Rainwater harvesting can be used for which of the following credits or prerequisites?

53. What must the project team do in order to maximize the reduction in operational costs with regard to Sustainable Sites Credit, Site Improvement Plan?

54. A tenant is moving into a new space in an existing building. They will fit out this new space and are considering LEED Certification. The tenant is projecting that 80% of the space will be used as office space. They will also have 10% of the space serving as a data center supporting the office. The remaining 10% will be used as a store showcasing and selling their consumer products for direct purchase to the general public. According to the Rating System Selection Guidance, which rating system would be most applicable for this project?

55. Which of the following is a feature of the ENERGY STAR® Portfolio Manager?

56. What public health risk must be balanced with water efficiency and chemical usage in every water treatment program?

57. Which of the following parameters need to be continuously monitored for occupied spaces in order to qualify for Indoor Environmental Quality Credit, Thermal Comfort?

58. To fulfill the Indoor Environmental Quality Prerequisite, Green Cleaning Policy, cleaning chemicals must be handled in a manner that

59. Who needs to be surveyed for an in-patient hospital project for Location and Transportation Credit, Alternative Transportation: Option 1. Transportation Survey?

60. When conducting the Indoor Environmental Quality Credit, Occupant Comfort Survey what is the minimum percentage of building occupants that must respond?


 

LEED Green Associate Dumps (V9.02) - Prepare for Your USGBC LEED Green Associate Exam with the Most Updated Materials
USGBC LEED AP ND Dumps (V8.02) - Enhance Your Skills in LEED AP Neighborhood Development (LEED ND) Certification Exam

Add a Comment

Your email address will not be published. Required fields are marked *