Huawei H20-681 HCS-Field-Smart PV Controller Real Exam Questions

Are you preparing for HCS-Field-Smart PV Controller certification? With HCS-Field-Smart PV Controller certification, you’ll have the ability to provide installation, configuration, maintenance and troubleshooting, etc. of Huawei Smart PV Controller and related products. We newly updated H20-681 exam questions to help you prepare for your HCS-Field-Smart PV Controller exam well. Once choose real H20-681 exam questions, you can pass HCS-Field-Smart PV Controller H20-681 exam in the first try.

Try H20-681 Free Exam Questions Online First

1. The NetEco1000S is an equipment-level monitoring software for inverters. It is mainly used in SUN2000, SUN8000 and third-party inverters.

 
 

2. The device that cannot be upgraded by the NetEco1000S system for remote software is ()

 
 
 
 

3. About the description of SmartLogger1000 and SmartLogger2000, which is incorrect? (Multiple Choice)

 
 
 
 

4. Huawei Smart Array Controller SmartACU2000B is recommended to be larger than () mm from the ground when installing.

 
 
 
 

5. About Huawei’s smart photovoltaic solution grounding system design, which of the following is correct? (Multiple Choice)

 
 
 
 

6. When the debugging of the Huawei PLC communication network is started, which of the operation description of setting the anti-crosstalk is correct? (Multiple Choice)

 
 
 
 

7. When installing the AC line of the Huawei SUN2000 inverter, it is recommended that the stripping length of the insulation layer be 2mm~3mm longer than the crimping area of the OT terminal sub cable for convenient wiring. After pressing the terminal, the place of line needs to be covered with a heat shrinkable T bush or insulating rubber tape.

 
 

8. During the operation of Huawei SUN2000L household inverter, the inverter “DC SWITCH” can be directly set to “OFF” for shutdown operation.

 
 

9. Which of the following design is not suitable for a mountain photovoltaic power station system?

 
 
 
 

10. The Huawei PID module adjusts the photovoltaic panel PV+ or PV- voltage to earth by injecting voltage between N line and ground line of the isolation transformer, to realize the inhibition of photovoltaic panel PID effect.

 
 

11. Huawei’s SUN2000 inverter communicates by PLC mode when the baud rate defaults to ().

 
 
 
 

12. Huawei SUN2000 inverter recommended the bottom installation space requirements are:

 
 
 
 

13. When the Huawei SUN2000 inverter is alarmed and cannot be connected to the network, the alarm ID is 313-1 (low insulation resistance). Which of the following measures can be taken to troubleshoot or try to solve? (Multiple Choice)

 
 
 
 

14. When the Huawei PID module is applied to the SUN2000 scenario, which of the following description is correct? (Multiple Choice)

 
 
 
 

15. Which of the following inverter parameters can be modified by the advanced user login Huawei SUN2000 APP?

 
 
 
 

16. Huawei SUN2000 inverter power factor can be adjusted to ().

 
 
 
 

17. EHS includes environmental, occupational health and safety. Among them, occupational safety is the most important. Personnel behavior can neglect the impact on the environment and occupational health under the premise of ensuring safety.

 
 

18. The incoming and outgoing line mode of Huawei’s intelligent sub-array controller SmartACU2000B adopts up-out and down-in.

 
 

19. The default value of the RS485 communication address of the Huawei PID module is 1. To modify the RS485 communication address, you can modify it by logging in to the SmartLogger’s WEBUI interface.

 
 

20. In the Smartlogger WebUI interface, when the “Active Power Control” parameter is configured as “Enable”, the Smartlogger can perform active power control on the managed inverter.

 
 

Huawei HCNA-GSM RNP&RNO H35-510-ENU Exam Dumps
Real HCIA-Big Data 2.0 H13-711 Exam Dumps

Add a Comment

Your email address will not be published. Required fields are marked *