DumpsBase is here to provide the newest dumps to help you prepare for the SAP Certified Associate – SAP S/4HANA Cloud Private Edition, Production Planning and Manufacturing C_TS422_2023 exam well. We know, the C_TS422_2023 SAP certification exam aims to verify that you possess the core skills required for the SAP S/4HANA Manufacturing consultant profile and proves that you have an overall understanding and in-depth technical skills to participate as a member of a project team in a mentored role. To prepare efficiently for the SAP C_TS422_2023 exam, it’s crucial to familiarize yourself with its structure and content. The newest C_TS422_2023 dumps (V9.02), including the types of questions and topics covered, will help you allocate your study time effectively. Invest your time wisely, leverage the newest SAP C_TS422_2024 dumps to get ready for the actual exam, and take that crucial step towards enhancing your SAP Certified Associate certifications.

SAP Certified Associate Certification C_TS422_2023 Free Dumps

1. Which of the following are possible configuration steps when setting up the alert monitor in Advanced Planning? Note: There are 2 correct answers to this question.

2. where does the system check master data selection settings during the creation of planned orders and production orders? Note: There are 3 Correct answers to this question.

3. You use planning strategy Finite Scheduling with Reverse and want to allow scheduling the past.

How can you parameterize this in the strategy profile?

4. What is the purpose of a reporting point confirmation in repetitive manufacturing? Note: There are 2 Correct answers to this question?

5. Generic Parent » Generic 1 pt

What is the purpose of collective orders?

6. You want to schedule an operation finitely, without removing other operations.

Which scheduling strategy do you select?

7. When you create a sales order

When can consumption of planned independent requirements take place for planning strategy 40 (Planning with final assembly?

8. What are the consequences when you assign a planned order to a production line manually, using the planning table in repetitive manufacturing?

9. During production order creation, several valid production versions are found.

How does the system choose the production version?

10. What data can you maintain in the subitems of a bill of material (BOM)? Note: There are 2 correct answers to this question.

11. Your production planners must execute planning only for specific resources.

How can you achieve this in Advanced Planning (PP/DS)?

12. in your Plant, MRP is activated.

which options do you have to exclude a material from the MRP run? Note: there are 2 correct answers to this question.

13. How can you support a GMP (Good Manufacturing Practice)-compliant production process? Note: There are 3 correct answers to this question.

14. Mode selection is one of the scheduling options available with Advanced Planning in SAP S/4HAN

A. When can you use mode selection?

A. When multiple production versions are maintained for one product

B. When multiple operations are maintained for one product

C. When alternative resources are used within one operation

D. When multiple planned orders exist on one resource

15. Your project uses process orders for the production of liquid chemicals.

What can you define to ensure that production flow only happens in suitable and physically connected tanks? Note: There are 2 correct answers to this question.

16. How can you limit the validity of a bill of material (BOM)? Note: There are 2 correct answers to this question,

17. Why would you use phantom assemblies? Note: There are 3 correct answers to this question.

18. Which of the following questions do you have to answer before you start creating a bill of material (BOM)?

19. Advanced Planning uses master data and transaction data from SAP S/4HANA In which data objects can you set the Advanced Planning flag? Note: There are 2 correct answers to this question.

20. What time element of midpoint scheduled operations can be reduced by reduction strategy settings while dispatching? Note: There are 2 correct answers to this question

21. Which time elements are relevant for lead time scheduling of a production order? Note: There are 2 correct answers to this question.

22. For production orders, cost object controlling (COC) can be carried out on an order-related or product- related basis.

Which of the following do you have to consider? Note: There are 2 correct answers to this question.

23. You want to trigger in-house production of a semi-finished material before a sales order for the corresponding finished good is received.

Which planning strategy supports the consumption of planned independent requirements for the semi-finished material?

24. Which alternative item strategies are available in bills of material (BOMs) in SAP S/4HANA. Note: there are 2 correct answers to this question.

25. Which of the following processes lead to an entry in the MRP planning file? Note: There are 3 correct answers to this question.

26. What determines whether the planned independent requirements in demand management are consumed by other requirements? Note: There are 2 correct answers to this question.

27. If the stock level drops below the reorder stock in reorder point planning, what logic would the system use to trigger procurement?

28. Where do you maintain data to determine the duration of an operation for production? Note: There are 2 correct answers to this question.

29. What are the options if the Dispatched operation status is set for a production order operation? Note: There are 2 correct answers to this question.

30. Which time elements are part of a routing operation? Note: There are 3 correct answers to this question.


 

 

 

How to Prepare for Your SAP Certified Associate - Integration Developer Exam? - Choose C_CPI_2404 Dumps of DumpsBase
Practice SAP C_TB1200_10 Dumps (V8.02) - The Quickest Way to Pass Your SAP Business One Release 10.0 Exam

Add a Comment

Your email address will not be published. Required fields are marked *