Actual CTS Dumps (V8.02) with the Latest Exam Questions and Answers – Complete Your Certified Technology Specialist (CTS) Certification

Earning the Certified Technology Specialist (CTS) will prove that you are capable of performing general audiovisual tasks by creating, implementing, supporting, and servicing AV solutions that meet the client’s needs. It will accelerate your career in the competitive IT industry. To help you pass the CTS exam, DumpsBase offers the actual CTS dumps (V8.02) that simplify your preparation process. Designed specifically for the Certified Technology Specialist CTS exam, these dumps save time and ensure you study effectively. DumpsBase supports your AVIXA Certifications journey by providing updated Certified Technology Specialist CTS dumps in two formats: PDF and software. These versatile formats allow you to tailor your preparation to suit your learning preferences, making it easier to achieve success. DumpsBase equips you with all the tools you need to pass the challenging CTS exam on your first attempt. Whether you choose the simulated software version or the portable PDF dumps, you can be confident in your preparation.

Check the Certified Technology Specialist (CTS) free dumps to verify the quality:

1. Refer to the exhibit.

According to the Gantt chart pictured, the Project Manager should wait to start Activity C until which predecessor has been reached?

2. As part of a service agreement offering, wfwt PRIMARY role do preventive maintenance visits (PM/PMV) play?

3. Which frequencies are amplified by a subwoofer?

4. HOTSPOT

Which section of the Ohm's Law chart should be used to calculate values expressed in Ohms? Select the answer by clicking anywhere within the correct quadrant.

5. When doing a site survey, it is MOST IMPORTANT to consider the client's

6. As the height of a character increases on a display.

7. Assuming that the speakers in the picture on the LEFT are 8 Q drivers, what is the impedance of the speaker system on the left?

8. During a routine service visit, an engineer notices an LED indicator on a projector's front panel blinking regularly.

What should be done?

9. When connecting a condenser microphone, what MUST be included in die system design for it to operate?

10. When creating an estimate for a request for proposal (RFP), what is the FIRST tiling that should be done?

11. Network Quality of Service (QoS) is defined as

12. A saeen is 144 in (3658 mm) wide and the throw ratio is 2.3:1.

How far from the screen should the projector be placed?

13. Which method of control is supported by HDBaseT?

14. During project delivery and after completion, it is important to ensure correct management of control system code so that

15. Assuming a 10' (3 m) ceiling, what is the approximate volume of this room?

16. The BEST way to ensure that a project is on budget is to

17. Maintaining AV operations includes which of the following?

18. How frequently should a personal fall arrest harness be inspected?

19. When discussing a proposed audiovisual project with a new customer, it is important for the salesperson to FIRST

20. Project documentation states the system must logically Isolate control and media networks.

What piece of network equipment should be used?

21. To help end users remember key points of the training, the training documentation should include

22. When an audio device can no longer accurately reproduce the audio signal, It is called

23. Which kind of drawing should a technician refer to in order to determine how to hang a loudspeaker line array?

24. During the site survey, the client indicates that the space that will become a rear projection room is currently an off-white color.

What should be recommended to the client?

25. During an initial customer visit, it is important to determine whether or not one is

26. The contrast control sets the

27. The circuit on the RIGHT is an electrical drawing of what type of speaker system?

28. When planning to use audio equipment on a converged enterprise network, it may be desirable to separate broadcast domains in order to

29. An application requires Its equipment to be operational 24 hours a day and the owner considers the system mission critical.

What type of warranty would be BEST for the equipment?

30. A client has ordered a large project from a company. This project has several critical components and a fixed schedule.

Which of the following will be VITAL for ensuring that the company meets the deadlines?

31. Before confirming an anticipated completion date with the customer, it is MOST important to

32. Which of the following is addressed within the Needs Analysis part of the AV Design process?

33. What is the MAIN difference between OLED displays and LED displays?

34. During a site survey of a facility to be upgraded or modernized, it is important to check wireless microphones that may be redeployed to ensure

35. When calibrating a loudspeaker system, which weight setting on the SPi. meter is used for its mdus>on of low frequency sound levels in the measurement?

36. A client has ordered a large LED video wall to be installed in an existing board room.

What should be the integrator's MAIN operational concerns?

37. Assuming that the screen and projector are both Ethernet controllable devices, where does the control system for the AV solution need to exist?

38. Your client has requested a 50inch monitor be mounted on the south wail of this boardroom.

Which two recessed lights will need to be separated into the r own zone in order to turn them off when the monitor is on?

39. What is the name for a written, non-technical narrative that explains system functionality?

40. Knowledge of the overall room function as envisioned by the client provides a

41. A loud hiss is coming from the audio system. This is MOST LIKELY caused by

42. On a construction project awarded through a competitive process, the electrical contractor says that the AV company is responsible for the installation of conduit.

What project document(s) would determine responsibility?

43. Reverberant sound reaches the listener's ears

44. One MAIN benefit of multicast over unicast in a network AV solution is it

45. What is the document that shows project tasks, indicating their allocated time, dependencies, and relationships between activities?

46. An event planner for a banquet surrounding a swimming pool has requested that the pool be lit in the client’s colors using underwater lighting.

What does the technician need to consider?

47. Which of the following project management activities coordinates project requirements and resources?

48. Which type of contract involves ongoing support for an AV system, regardless of the age of the facility or who did the initial installation?

49. A task cannot begin before another task is completed.

How is this described in a project task schedule?

50. For a design-bid (tender)-build project, the final step for determining the owner's costs for an AV system is

51. What is the BEST way to manage a campus-wide AV system deployment?

52. What would be the BEST way to verify proper performance of a CAT cable fitted with a new termination?

53. Which of the following translates the IP address of a computer in a local network to a single IP address?

54. What is the aspect ratio in these images?

55. Which of these cables should be used for a balanced microphone signal?

56. In order to mount a projector so that it is horizontally centered with the suspended screen, the technician should look at which drawings in the plans?

57. The MAIN benefit of an inventory tracking system in an AV rental and staging business is having an accurate record of

58. Which section of a program report describes the probable costs of an AV project?

59. Company information, statement of work, drawings, and bill of materials are presented to the customer as what set of documents?

60. Upon completion of hardware installation and configuration for a new deployment, the NEXT thing the AV Project Manager should have scheduled is

61. After installation, the system does not pass audio.

Based on the information in the drawing, what is the MOST LIKELY cause?

62. Which of the following testing metrics would BEST be applied towards testing a distributed audio system for proper speaker wattages and cabling?

63. When gathering information, it is important to ask about the customer's goals because the

64. After there is an approved labor change to a project, what should the project manager do NEXT?

65. What is the PRIMARY advantage of preventive maintenance?

66. What are the dimensions of UHD resolution?

67. What PRIMARY concern should the sales representative have had during the site survey of this room?

68. What is the FIRST stage in troubleshooting an AV system?

69. Which document is used to clarify a project design issue?

70. Which of the following is the BEST service when new firmware is available for installed equipment across a fleet of conference rooms?


 

Add a Comment

Your email address will not be published. Required fields are marked *