Practice Makes Perfect: Updated CTIL-001 Dumps (V9.03) Available for Learning

The CTIL-001 certification from GAQM, which is aimed at intermediate-level software testers, offers a valuable opportunity to advance your career in the field. By utilizing the updated CTIL-001 dumps (V9.03) provided by DumpsBase, you can ensure that you are fully equipped to tackle the CTIL-001 GAQM Certified Software Tester – Intermediate Level (CSTIL) exam and achieve success. These exam dumps, meticulously crafted by experts, are designed to offer top-notch services to candidates, enabling them to easily clear the CTIL-001 Certified Software Tester – Intermediate Level (CSTIL) Exam. While there are other providers of GAQM CTIL-001 exam materials, none are as effective as DumpsBase’s CTIL-001 exam dumps V9.03. To increase your chances of passing the GAQM Certified Software Tester – Intermediate Level (CSTIL) exam on your first attempt, it is essential to obtain the best GAQM CTIL-001 test exam and thoroughly prepare using these resources.

GAQM Certified Software Tester – Intermediate Level (CSTIL) CTIL-001 Free Dumps

1. Case Study: 1

Scenario

A computerized system is being created to monitor the life support system on board a submarine. It monitors air quality, water supplies and temperature.

This system will be supplied and maintained by SubsInc. SubsInc uses the V-model for software development and conducts four levels of testing, from unit through to operational and site acceptance testing.

Two key risks identified for the air quality system are:

If the percentage of oxygen in the air falls too low, personnel may suffocate

If the concentration of carbon dioxide in the air rises too high, the air may become toxic.

To address these risks, the requirement specification for this system includes the following requirements:

R1) Oxygen must be replaced as it is consumed. R2) Carbon dioxide must be removed from the air. These requirements must be reflected in the functional, technical and program specification documents.

You are a newly recruited test manager.

A risk register has been produced with the following additional risks identified.

Which one is a product risk associated with the air quality management system?

2. Which of the following would be an entry criterion into site acceptance testing for the air quality monitoring system?

3. Which of the following is an accurate depiction of the hierarchy of test management documentation (where the highest comes first)?

4. Which of the following test design techniques would be most suitable for testing that the oxygen is released at the required times?

5. When creating the functional specification for the temperature control system, which of the following review types would be most recommended to resolve any issues?

6. Case Study: 2

Scenario

Your organization is a large media services corporation (MSC). MSC uses Agile development, within a Scrum framework. Here, the iterations are referred to as Sprints. For each Sprint, a set of user-stories is defined, built, and tested. The user-stories are typically 12 lines long, indicating what the customer wants the system to do.

MSC is in the process of updating its website to meet the recently introduced accessibility rules for websites. Accessibility means the availability of a system suitable to members of the public with, for example, visual or hearing difficulties.

It has been decided to start with two requirements, as its first 2 Sprints:

1) Presentation of content with clear headings, short sentences, text versions always available.

2) Consistent navigation through the website.

You are the test manager and there are four developers and two testers. You have all worked together previously, and are very experienced in MSCs products. Although the accessibility rules are new to you and the team, you have all attended a workshop where they were explained.

Which of the following are product risks and which are project risks?

a) The navigation through some parts of the website may need to be different from others.

b) Sprint 1 may not be completed on time, leading to a delay to the start of Sprint 2.

c) Text versions of images may not always be possible.

d) There may be a need to buy a capture-replay tool for regression testing.

key member of the team may leave before the Sprints have been completed.

7. Which stage of the Fundamental Test Process will be most affected by the use of user-stories as defined above?

8. Which of the following review types would be recommended at the start of each Sprint, for the reason given?


 

GAQM CDCS-001 Exam Dumps V9.03 (Updated in November of 2023) - Good Materials for Certified Data Centre Specialist (CDCS) Exam Preparation
Pass Certified Lean Six Sigma Green Belt (CLSSGB) Certification Exam - Use CLSSGB-001 Dumps of DumpsBase to Ace Your Test

Add a Comment

Your email address will not be published. Required fields are marked *